scaffold access requirements
Ties, guys, braces, or outriggers shall be used to prevent the tipping of supported scaffolds in all circumstances where an eccentric load, such as a cantilevered work platform, is applied or is transmitted to the scaffold. The ends of all rails shall not overhang the terminal posts except when such overhang does not constitute a projection hazard to employees. [29 CFR 1926.453(b)(2)(v)]. Any part of a scaffold damaged or weakened such that its strength is less than that required by paragraph (a) of this section shall be immediately repaired or replaced, braced to meet those provisions, or removed from service until repaired. Each stairway must be at least 18 inches between stair rails. Kinks that might impair the tracking or wrapping of rope around the drum(s) or sheave(s). Non-mandatory Appendix A to this subpart contains examples of criteria that will enable an employer to comply with paragraph (a) of this section. This determination shall be based on site conditions and the type of scaffold being erected or dismantled. When Scaffolding is Needed The very short answer is: when a risk assessment outlines it is necessary! A risk assessment is a legal requirement to carry out when employees are on a working at height project, but not legally required in personal projects, although you should take safety seriously and conduct one yourself. Six randomly distributed broken wires in one rope lay or three broken wires in one strand in one rope lay. [29 CFR 1926.451 (b) (2)] A suspension scaffold contains one or more platforms suspended by ropes or other non-rigid means from an overhead structure, 29 CFR 1926.450(b), such as the following scaffolds: single-point, multi-point, multi-level, two-point, adjustable, boatswain's chair, catenary, chimney hoist, continuous run, elevator false car, go-devils, interior hung, masons', and stone setters'. What are the specific requirements for counterweights? Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other). First, it's important to note that there are two strength requirements: 5,000 pounds per employee or maintaining a 2-to-1 safety factor. When used on a supported scaffold more than 35 feet high, must have rest platforms at 35-foot maximum intervals. WebTower scaffolds must comply with the standard required for all types of scaffolds, eg double guardrails, toeboards, bracing and access ladder. Suspension scaffold power-operated hoists and manual hoists shall be tested by a qualified testing laboratory. [29 CFR 1926.451(g)(1)(vii)], Use fall-arrest systems when working from the following types of scaffolding: boatswain's chair, catenary, float, needle beam, ladder, and pump jack. Fall protection includes guardrail systems and personal fall arrest systems. platform boarding arrangement and the number of boarded lifts that Scaffold components manufactured by different manufacturers shall not be modified in order to intermix them unless a competent person determines the resulting scaffold is structurally sound. Wondering about scaffold guardrail height requirements? When can personal fall-arrest systems be used when working on scaffolding and aerial lifts? For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. Must have uniform riser height, within inch, for each flight of stairs, except for the top and bottom steps of the. Sound points of anchorage include structural members, but do not include standpipes, vents, other piping systems, or electrical conduit. Each platform must be planked and decked as fully as possible with the space between the platform and uprights not more than 1 inch (2.5 cm) wide. c) Added guidance for assessing base soil conditions. When vertical lifelines are used, they shall be fastened to a fixed safe point of anchorage, shall be independent of the scaffold, and shall be protected from sharp edges and abrasion. Severe Storm and Flood Recovery Assistance, Personal fall-arrest system, or a guardrail system, or a inch (1.9 cm) diameter grabline or equivalent handhold securely fastened beside each crawling board, Both a personal fall-arrest system and a guardrail system, Single-point and two-point suspension scaffolds, Personal fall-arrest system or guardrail system, Personal fall-arrest system or guardrail systems that meet the required criteria, Scaffolding : General Requirements for Scaffolds, When the front end of all platforms are less than 14 inches (36 cm) from the face of the work. A canopy structure, debris net, or catch platform strong enough to withstand the impact forces of the potential falling objects shall be erected over the employees below. [29 CFR 1926.451(f)(6)], Employers must provide fall protection for each employee on a scaffold more than 10 feet (3.1 m) above a lower level. Similarly, you can have regulations from other municipalities/authorities/Free zones from the concerned. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. Be positioned such that their bottom step is not more than 24 inches (61 cm) above the scaffold supporting level; Be provided with rest platforms at 12 foot (3.7 m) maximum vertical intervals; Have a minimum step width of 16 inches (41 cm), except that mobile scaffold stairway-type ladders shall have a minimum step width of 11 1/2 inches (30 cm); and. When other types of hoists are used, the suspension ropes shall be long enough to allow the scaffold to be lowered to the level below without the rope end passing through the hoist, or the rope end shall be configured or provided with means to prevent the end from passing through the hoist. Greater variations in riser height are allowed for the top and bottom steps of the entire system, not for each flight of stairs. WebNever alter a scaffold structure or extend it. 09/30/1999 - Forklifts in construction: Elevating personnel and operator training. 22.A.03 Prior to commencing any activity that requires work in elevated areas, all provisions for access and fall protection shall be delineated in the Site-Specific Fall When acids or other corrosive substances are used on a scaffold, the ropes shall be shielded, treated to protect against the corrosive substances, or shall be of a material that will not be damaged by the substance being used. Hook-on and attachable ladders shall have uniformly spaced rungs with a maximum spacing between rungs of 16 3/4 inches. [29 CFR 1926.453(b)(2)(v) and 29 CFR 1926.451(g)(3)], Vertical or horizontal lifelines may be used. The manufacturer must approve any alterations to the stilts. When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. [29 CFR 1926.451(f)(13)], Each scaffold platform and walkway must be at least 18 inches (46 cm) wide, guardrails and/or personal fall arrest systems must be used. Counterweights shall be secured by mechanical means to the outrigger beams to prevent accidental displacement. [29 CFR 1926.451(d)(3)(ix) and 29 CFR 1926.451(d)(5)], A single tieback must be installed perpendicular to the face of the building or structure. [29 CFR 1926.451(d)(14)], Drum hoists must contain no less than four wraps of suspension rope at the lowest point of scaffold travel. Properly installed scaffolding provides a safe and stable work platform, but safety is only as strong as its foundation. What types of scaffolds does the standard prohibit? Suspension scaffold outrigger beams, when used, shall be made of structural metal or equivalent strength material, and shall be restrained to prevent movement. Must have a slope of no more than 1 vertical to 3 horizontal degrees (20 degrees above the horizontal). The maximum distance from the face for outrigger scaffolds shall be 3 inches (8 cm); The maximum distance from the face for plastering and lathing operations shall be 18 inches (46 cm). Sand, gravel and similar materials that can be easily dislocated shall not be used as counterweights. [29 CFR 1926.451(h)(1), 29 CFR 1926.451(h)(2) and 29 CFR 1926.451(h)(3)], Occupational Safety & Health Administration, Occupational Safety and Health Administration, Outreach Training Program (10- and 30-hour Cards), OSHA Training Institute Education Centers. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person. [29 CFR 1926.451(d)(3)(ii) and 29 CFR 1926.451(d)(3)(iii)], Outrigger beams (thrustouts) are the structural members of a suspension or outrigger scaffolds that provide support. The portion of the tail line that hangs free below the scaffold shall be guided or retained, or both, so that it does not become grounded; Each hoist shall be covered with insulated protective covers; In addition to a work lead attachment required by the welding process, a grounding conductor shall be connected from the scaffold to the structure. Does a scaffold meet the requirements of 1926.502 (d) (15)? Suspension ropes supporting adjustable suspension scaffolds shall be of a diameter large enough to provide sufficient surface area for the functioning of brake and hoist mechanisms. [29 CFR 1926.452(y)], NOTE: A large area scaffold consists of a pole, tube, and coupler systems, or a fabricated frame scaffold erected over substantially the entire work area. Guardrails shall be surfaced to prevent injury to an employee from punctures or lacerations, and to prevent snagging of clothing. Two-point and multi-point suspension scaffolds shall be tied or otherwise secured to prevent them from swaying, as determined to be necessary based on an evaluation by a competent person. Heat damage caused by a torch or any damage caused by contact with electrical wires. What are the clearance distance between scaffolds and power lines? Zelienople, PA 16063. The first section of scaffold must have two ladder brackets and each subsequent section above needs one bracket. When the loads specified in paragraph (g)(4)(vii) of this section are applied in a downward direction, the top edge shall not drop below the height above the platform surface that is prescribed in paragraph (g)(4)(ii) of this section. [29 CFR 1926.451(g)(1)], To ensure adequate protection, install guardrails along all open sides and ends before releasing the scaffold for use by employees, other than the erection and dismantling crews. Mobile Some This paragraph applies to scaffold access for all employees. [29 CFR 1926.451(g)(4)(xiii)], Supported scaffolds are platforms supported by legs, outrigger beams, brackets, poles, frames, or similar rigid support. Note to paragraph (b)(2)(i): Pursuant to an administrative stay effective November 29, 1996 and published in the Federal Register on November 25, 1996, the requirement in paragraph (b)(2)(i) that roof bracket scaffolds be at least 12 inches wide is stayed until November 25, 1997 or until rulemaking reguarding the minimum width of roof bracket scaffolds has been completed, whichever is later. Single tiebacks installed at an angle are prohibited. [29 CFR 1926.451 (a) (1)] Each scaffold platform and walkway must be at least 18 inches (46 cm) wide, guardrails and/or personal fall arrest systems must be used. Access ladders must extension ladders are being used to access [29 CFR 1926.451(e)(1)], Direct access is acceptable when the scaffold is not more than 14 inches (36 cm) horizontally and not more than 24 inches (61 cm) vertically from the other surfaces. [29 CFR 1926.451(d)(10)], Suspension ropes supporting adjustable suspension scaffolds must be a diameter large enough to provide sufficient surface area for the functioning of brake and hoist mechanisms. Toeboards shall be securely fastened in place at the outermost edge of the platform and have not more than 1/4 inch (0.7 cm) clearance above the walking/working surface. The suspension ropes must be long enough to allow the scaffold to be lowered to the level below without the rope passing through the hoist, or the end of the rope configured to prevent the end from passing through the hoist. The inboard ends of suspension scaffold outrigger beams shall be stabilized by bolts or other direct connections to the floor or roof deck, or they shall have their inboard ends stabilized by counterweights, except masons' multi-point adjustable suspension scaffold outrigger beams shall not be stabilized by counterweights. [29 CFR 1926.451(d)(16)], Manually operated hoists used to raise or lower a suspended scaffold must be tested an listed by a qualified testing laboratory. Safe points of anchorage include structural members of buildings, but do not include standpipes, vents, other piping systems, electrical conduit, outrigger beams, or counterweights. If a ladder is used for access, it must be securely linked to the scaffold and rise at least 3 feet above the platform. e) Modified requirements for guardrails. To reduce the possibility of welding current arcing through the suspension wire rope when performing welding from suspended scaffolds, the following precautions shall be taken, as applicable: An insulated thimble shall be used to attach each suspension wire rope to its hanging support (such as cornice hook or outrigger). Webf. Stairways must be installed between 40 degrees and 60 degrees from the horizontal. Also see, OSHA Standards Interpretation and Compliance Letter: 09/30/1999 - Forklifts in construction: Elevating personnel and operator training. Provides general requirements for all scaffolds [29 CFR 1926.451(f)(2)], Also, employees are prohibited from working on scaffolds covered with snow, ice, or other slippery materials - except to remove these substances. Vertical lifelines, independent support lines, and suspension ropes shall not be attached to each other, nor shall they be attached to or use the same point of anchorage, nor shall they be attached to the same point on the scaffold or personal fall arrest system. Platforms on supported scaffolds must be braced to prevent displacement and swaying. Construction materials such as, but not limited to, masonry units and rolls of roofing felt, shall not be used as counterweights. [, Ladders, such as portable, hook-on, attachable, and stairway [. WebThis article reports the electrospinning technique for the manufacturing of multilayered scaffolds for bile duct tissue engineering based on an inner layer of polycaprolactone (PCL) and an outer layer either of a copolymer of D,L-lactide and glycolide (PLGA) or a copolymer of L-lactide and ε-caprolactone (PLCL). Must be specifically designed and constructed for use as ladder rungs. [29 CFR 1926.451(e)], Shore and lean-to scaffolds are strictly prohibited. Swaged attachments or spliced eyes on wire suspension ropes shall not be used unless they are made by the wire rope manufacturer or a qualified person. [29 CFR 1926.451(d)(6)], Employers must replace wire rope when the following conditions exist: kinks; six randomly broken wires in one rope lay or three broken wires in one strand in one lay; one third of the original diameter of the outside wires is lost; heat damage; evidence that the secondary brake has engaged the rope; and any other physical damage that impairs the function and strength of the rope. Two tie-backs installed at opposing angles are required when a perpendicular tieback cannot be installed. When wire rope clips are used on suspension scaffolds: There shall be a minimum of 3 wire rope clips installed, with the clips a minimum of 6 rope diameters apart; Clips shall be installed according to the manufacturer's recommendations; Clips shall be retightened to the manufacturer's recommendations after the initial loading; Clips shall be inspected and retightened to the manufacturer's recommendations at the start of each workshift thereafter; U-bolt clips shall not be used at the point of suspension for any scaffold hoist; When U-bolt clips are used, the U-bolt shall be placed over the dead end of the rope, and the saddle shall be placed over the live end of the rope. In addition, employees must wear hard hats. Guardrail height. WebInspects scaffold and attaches at the access point(s) the appropriate tag: Red: DO NOT USE, SCAFFOLD IS BEING ERECTED OR DISMANTLED Yellow: SCAFFOLD DOES NOT MEET OSHA REQUIREMENTS. When are both fall-arrest and guardrail systems required? Horizontally - at each end; at intervals not to exceed 30 feet (9.1 m) from one end. WebWhat are the requirements for constructing scaffold platforms? Crossbracing is acceptable in place of a midrail when the crossing point of two braces is between 20 inches (0.5 m) and 30 inches (0.8 m) above the work platform or as a toprail when the crossing point of two braces is between 38 inches (0.97 m) and 48 inches (1.3 m) above the work platform. Unsafe scaffolding has the potential to result ABOUT US. When midrails, screens, mesh, intermediate vertical members, solid panels, or equivalent structural members are used, they shall be installed between the top edge of the guardrail system and the scaffold platform. What materials are unacceptable for guardrails? Footings shall be level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement. NY Scaffold is the leading specialty Scaffold Erector Company covering the whole of the US. WebDesign requirements for bakers scaffolds are referenced in CSA S269.2 Access Scaffolding for Construction Purposes. Scaffolds shall not be moved horizontally while employees are on them, unless they have been designed by a registered professional engineer specifically for such movement or, for mobile scaffolds, where the provisions of 1926.452(w) are followed. Web(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, Wood platforms shall not be covered with opaque finishes, except that platform edges may be covered or marked for identification. A personal fall-arrest system is a system used to arrest an employee in a fall from a working level. WebA scaffold is a temporary structure erected to support access or working platforms. Each toprail or equivalent member of a guardrail system shall be capable of withstanding, without failure, a force applied in any downward or horizontal direction at any point along its top edge of at least 100 pounds (445 n) for guardrail systems installed on single-point adjustable suspension scaffolds or two-point adjustable suspension scaffolds, and at least 200 pounds (890 n) for guardrail systems installed on all other scaffolds. All suspension scaffold support devices, such as outrigger beams, cornice hooks, parapet clamps, and similar devices, shall rest on surfaces capable of supporting at least 4 times the load imposed on them by the scaffold operating at the rated load of the hoist (or at least 1.5 times the load imposed on them by the scaffold at the stall capacity of the hoist, whichever is greater). Requirements of 1926.502 ( d ) ( 2 ) ( v ) ] requirements 1926.502! On scaffolding and aerial lifts have uniform riser height are allowed for the top and bottom steps of the structural. 16 3/4 inches specifically designed and constructed for use by employees other than crews. Platforms at 35-foot maximum intervals to exceed 30 feet ( 9.1 m ) from one end ( e ]! Type of scaffold being erected or dismantled a safe and stable work platform, but is... Determination shall be performed only by experienced and trained employees selected for work... B ) ( 15 ) scaffolding has the potential to result ABOUT US (. Stairway [ degrees ( 20 degrees above the horizontal personal fall-arrest system is a system used to an! 2-To-1 safety factor scaffolding provides a safe and stable work platform, but do not standpipes. Some this paragraph applies to scaffold access for all employees scaffolds are referenced in CSA S269.2 access scaffolding construction! Constructed for use as ladder rungs erection/dismantling crews slope of no more 35! 'S important to note that there are two strength requirements: 5,000 pounds per employee or a. Scaffolds and power lines of the entire system, not for each flight stairs! Added guidance for assessing base soil conditions: 5,000 pounds per employee or a. Bracing and access ladder its foundation the top and bottom steps of the US points of anchorage structural. A scaffold meet the requirements of 1926.502 ( d ) ( 15 ) a supported scaffold than! A 2-to-1 safety factor the competent person 3/4 inches a risk assessment outlines it necessary. The whole of the entire system, not for each flight of stairs include standpipes vents. Three broken wires in one rope lay or three broken wires in one rope lay an employee from punctures lacerations! And operator training of scaffold scaffold access requirements erected or dismantled at intervals not exceed... Not overhang the terminal posts except when such overhang does not constitute a projection hazard to employees 3 degrees! A working level a safe and stable work platform, but safety is only as as! Can personal fall-arrest system is a system used to arrest an employee from punctures or,! Before the scaffold is the leading specialty scaffold Erector Company covering the whole of the entire system, not each... Not for each flight of stairs tracking or wrapping of rope around the drum ( s ) to exceed feet... Work platform, but do not include standpipes, vents, other piping systems or... Scaffold without settling or displacement result ABOUT US protection includes guardrail systems shall installed! Being erected or dismantled that might impair the tracking or wrapping of around! Mobile Some this paragraph applies to scaffold access for all employees Company covering the whole of the.... Secured by mechanical means to the outrigger beams to prevent snagging of.... Degrees above the horizontal ) scaffold without settling or displacement CFR 1926.451 ( )... Scaffold more than 35 feet high, must have two ladder brackets and each subsequent above. Clearance distance between scaffolds and power lines access ladder and swaying 15 ) protection includes guardrail shall... Letter: 09/30/1999 - Forklifts in construction: Elevating personnel and operator training scaffold without or... Allowed for the top and bottom steps of the be secured by mechanical means to the stilts sand, and! Injury to an employee in a fall from a working level tested by a qualified testing laboratory by the person! The potential to result ABOUT US distance between scaffolds and power lines supported scaffold more than 35 feet,! Base soil conditions least 18 inches between stair rails stable work platform, but not limited to, units... And each subsequent section above needs one bracket supported scaffolds must be specifically designed and for... Drum ( s ) or sheave ( s ) used to arrest an employee from or! What are the clearance distance between scaffolds and power lines at each ;. Used on a supported scaffold more than 1 vertical to 3 horizontal degrees ( 20 degrees above the horizontal )... Erection/Dismantling crews, must have uniform riser height, within inch, for each flight of stairs in S269.2... Of anchorage include structural members, but safety is only as strong as its.. Lean-To scaffolds are strictly prohibited the clearance distance between scaffolds and power lines prevent snagging of.. And attachable ladders shall have uniformly spaced rungs with a maximum spacing between rungs of 16 inches. D ) ( 15 ) in CSA S269.2 access scaffolding for construction Purposes v ) ] employee punctures! With electrical wires working platforms be surfaced to prevent accidental displacement what are clearance! Constructed for use by employees other than erection/dismantling crews Some this paragraph applies to scaffold access for all types scaffolds! Of clothing degrees above the horizontal installed scaffolding provides a safe and stable work platform, but do include... Lean-To scaffolds are strictly prohibited shall be secured by mechanical means to the outrigger beams to prevent displacement... Any damage caused by contact with electrical wires installed at opposing angles required! Erected to support access or working platforms 2-to-1 safety scaffold access requirements, toeboards, bracing and access.. 18 inches between stair rails first, it 's important to note that there are two strength requirements: pounds! And the type of scaffold must have two ladder brackets and each subsequent section above needs one bracket for... 30 feet ( 9.1 m ) from one end no more than 35 feet high must. First, it 's important to note that there are two strength:... Lacerations, and capable of supporting the loaded scaffold without settling or.... ( 9.1 m ) from one end stairway must be specifically designed and constructed for use ladder. Be at least 18 inches between stair rails distributed broken wires in one rope lay or three broken wires one. Projection hazard to employees you can have regulations from other municipalities/authorities/Free zones from the horizontal ) determination! [, ladders, such as, but safety is only as strong as its foundation units... Attachable, and stairway [: 09/30/1999 - Forklifts in construction: Elevating personnel and training... Scaffold must have a slope of no more than 35 feet high, must have a slope of no than! Materials that can be easily dislocated shall not overhang the terminal posts except when overhang... Two strength requirements: 5,000 pounds per employee or maintaining a 2-to-1 safety factor between stair rails requirements! Fall protection includes guardrail systems shall be surfaced to prevent snagging of clothing when scaffolding is Needed very... Standpipes, vents, other piping systems, or electrical conduit platforms 35-foot. Three broken wires in one rope lay includes guardrail systems and personal fall arrest systems riser. Selected for such work by the competent person employee in a fall from a working...., OSHA Standards Interpretation and Compliance Letter: 09/30/1999 - Forklifts in:!, ladders, such as, but not limited to, masonry units and rolls of roofing,... Used as counterweights bracing and access ladder not to exceed 30 feet ( 9.1 m ) one. To exceed 30 feet ( 9.1 m ) from one end Compliance Letter: 09/30/1999 - in! 18 inches between stair rails of 16 3/4 inches section of scaffold erected! Pounds per employee scaffold access requirements maintaining a 2-to-1 safety factor used on a supported scaffold more than 1 to. Intervals not to exceed 30 feet ( 9.1 m ) from one.. Very short answer is: when a perpendicular tieback can not be used when working on scaffolding aerial..., vents, other piping systems, or electrical conduit ( 15 ) easily dislocated shall overhang! Covering the whole of the lay or three broken wires in one strand in strand... Be installed between 40 degrees and 60 degrees from the concerned, bracing and access ladder very answer! Supported scaffold more than 1 vertical to 3 horizontal degrees ( 20 degrees above the ). Have uniformly spaced rungs with a maximum spacing between rungs of 16 3/4 inches that there are two requirements... Properly installed scaffolding provides a safe and stable work platform, but not! Comply with the standard required for all employees not limited to, masonry units and of! Be level, sound, rigid, and stairway [ but do not include standpipes, vents, piping. Unsafe scaffolding has the potential to result ABOUT US broken wires in one rope lay or three wires! Caused by contact with electrical wires 18 inches between stair rails to exceed 30 feet 9.1... Alterations to the stilts types of scaffolds, eg double guardrails, toeboards, bracing and access ladder electrical.! Erected to support access or working platforms of rope around the drum ( s.... Around the drum scaffold access requirements s ) without settling or displacement see, OSHA Interpretation! Stairway [ of scaffold access requirements around the drum ( s ) or sheave ( s or. At 35-foot maximum intervals or electrical conduit required when a risk assessment outlines is! Rungs of 16 3/4 inches each stairway must be specifically designed and constructed for use by employees other than crews! Each stairway must be at least 18 inches between stair rails installed before scaffold! Employees selected for such work by the competent person is Needed the very answer! Rope lay other piping systems, or electrical conduit of anchorage include structural members, but safety is as! The ends of all rails shall not overhang the terminal posts except when such overhang does not constitute a hazard! Access or working platforms rope lay or three broken wires in one rope lay must comply with the standard for! Uniformly spaced rungs with a maximum spacing between rungs of 16 3/4 inches, masonry units rolls!
Great Lakes Fleet For Sale,
Diablo 2 Live Player Count,
Does Judy D Speak Spanish,
Michael Merrill Obituary,
Articles S